J.F. Shea Construction
  • TUNNELING
  • WATER Bid List
  • INFRASTRUCTURE
  • ABOUT US CAPABILITIES CONTACT US
J.F. Shea Construction
  • TUNNELING/
  • WATER/
    • WATER
    • Bid List
  • INFRASTRUCTURE/
  • COMPANY/
    • ABOUT US
    • CAPABILITIES
    • CONTACT US
HIGHWAY 101 LANDSLIDE MITIGATION
J.F. Shea Construction

Infrastructure Projects

J.F. Shea Construction
  • TUNNELING/
  • WATER/
    • WATER
    • Bid List
  • INFRASTRUCTURE/
  • COMPANY/
    • ABOUT US
    • CAPABILITIES
    • CONTACT US
HIGHWAY 101 LANDSLIDE MITIGATION

HIGHWAY 101 LANDSLIDE MITIGATION

Removal of one million cubic yards of mud that closed the only north/south coastal route south of Eureka. Shea began clearing within 12 hours. The highway opened to one-way traffic in seven days instead of the three weeks originally anticipated. 

BELLA VISTA

BELLA VISTA

Excavation and straightening of existing Highway 299, widening of travel lanes and bridge, new bridge, and new asphalt concrete road section. Project completed one year ahead of schedule and on budget. 

PENNSYLVANIA TURNPIKE

PENNSYLVANIA TURNPIKE

Complete reconstruction of two mainline Turnpike overhead bridges and approach roadways. Demolitions completed in a single 4-hour closure to limit impact to owner’s revenue stream. 

SODA BAY

SODA BAY

Despite work starting just 15 days before expiration of permits, Shea crews worked overtime for the county to complete work on the channel and open the road on Christmas Eve 2015.  

HAYNES STREET BRIDGE

HAYNES STREET BRIDGE

Removal and replacement of historic arch bridge over Stoney Creek for City of Johnstown. Architectural features such as cut stone form liners, arched steel girders and baluster parapets are incorporated into the construction to mimic the existing structure.

KINGSTON DAM

KINGSTON DAM

Three span 240-ft bridge replacement over Loyalhanna Stream. Bridge was constructed with equipment positioned above stream banks to limit environmental impacts on an important trout fishing stream.

AIRPORT ROAD

AIRPORT ROAD

Replacement of bridge serving Jimmy Stewart Airport over SR 119. Bridge removed and constructed in two phases to maintain traffic.

STAN MUSIAL BRIDGE

STAN MUSIAL BRIDGE

Major rehab of a 2,400-ft truss and girder, 10-span bridge over the Monongahela River, CSX and NFS Railways and two roads. An aggressive 9-month schedule maintained traffic conditions. 

1 2 3 4 5 6 7 8
Previous Next
HIGHWAY 101 LANDSLIDE MITIGATION
BELLA VISTA
PENNSYLVANIA TURNPIKE
SODA BAY
HAYNES STREET BRIDGE
KINGSTON DAM
AIRPORT ROAD
STAN MUSIAL BRIDGE

Corporate • 655 Brea Canyon Road • Walnut, CA 91789 • (909) 594-9500
Tunneling • 667 Brea Canyon Rd., Suite 22 • Walnut, CA 91789 • (909) 594-0990
Water • 667 Brea Canyon Rd., Suite 30 • Walnut, CA 91789 • (909) 595-4397
Redding • 17400 Clear Creek Rd. • Redding, CA 96001 • (530) 246-4292
Pennsylvania • 111 Thunder Rd. • Mount Pleasant, PA 15666 • (724) 547-0120

J.F. Shea Co. | Shea Properties | Shea Homes | Shea Mortgage | Jobs
Privacy Policy | Do Not Sell Or Share My Personal Information | Contact Us